Project Name: 1450 Brickell
Project Type: New Construction
Location: Miami, Florida
Date Completed: December, 2009

1450 Brickell is an office building in Miami Florida with 519,880 ft2 under air. Flexim Ultra-Sonic Flow & BTU Meters are installed and monitored by utiliVisor to improve the efficiency of the onsite HVAC equipment. In addition, strip meters will be installed as part of tenant fit-out to provide sub-metering for tenant billing.

Project Name: Central Energy Plant Zone 4, Nova Southeastern University
Project Type: New Construction
Location: Davie, Florida
Date Completed: September 2009

The Central Energy Plant provides cooling to the entire NSU campus. This 46,505 ft2 building will eventually house five 2,300 ton chillers, a 68,000 ton-hour ice-based thermal energy storage plant (one of the largest in the U.S.), and corresponding equipment. Flexim Ultra-Sonic Flow & BTU Meters and Temperature Sensors are installed throughout the plant, monitored by utiliVisor, which provides real-time monitoring of the flow and temperature through the HVAC equipment to maximize the plant efficiency.